Skip to main content
514-820-0773In stock in Quebec · 20+ years of experience · Online quotes
AlignmentsAdjustmentsFinish

Professional installation: precision, alignment and finish

Installation is the final stage where cabinets are set and adjusted on site: levelling, precise alignments, fastening and finishing. It is what turns fabricated elements into a clean, durable whole — on-site adjustments are an integral part of a professional install.

Technical drawing and panel samples for custom installation

A clean install changes how the whole room is perceived

Why installation makes all the difference

Walls, floors and ceilings are never perfectly straight. A professional installation absorbs that reality to deliver a clean and durable result.

Alignments

Doors, drawers and modules kept straight despite site irregularities.

Adjustments

Fine on-site tuning for a uniform and stable result.

Durability

A good installation reduces premature wear and visible defects.

What's included in a Dilamco installation

Installation is not just about fastening modules. It includes preparation, adjustment and final verification.

  • Site preparation Checking walls, floors, levels and visible constraints.
  • Levelling and fastening Secure and stable anchoring of the modules.
  • Door and drawer adjustment Precise alignment and smooth operation.
  • Final inspection Verification and adjustments before the project is delivered.
Custom installation in progress
On-site coordination
A clean install depends as much on preparation as on on-site adjustments.

Installation by project type

Installation logic changes depending on the space, the access and the level of use.

Custom kitchen with precise installation
Kitchen

Cabinets, islands and appliance integration.

KitchenIntegration
Custom bathroom with clean finish
Bathroom

Vanities and edge protection in humid environments.

HumidityFinish
Commercial fit-out with planned installation
Commercial

Heavy use, durability and coordination.

CommercialCoordination

FAQ - installation

Clear answers about the install, the adjustments and how the job unfolds.

How long an installation takes depends on the project type and its complexity. A bathroom vanity or a walk-in is generally set in a day or two, while a full kitchen — with an island, tall cabinets and appliance coordination — takes longer. We confirm the expected duration during planning, once the project scope is set, so you know what to expect on site.

Yes. Adjustments are part of a professional installation and are essential to the final result.

Yes. We install the elements we design and fabricate, which lets us guarantee consistency between fabrication and installation: same standards, same tolerances, one team responsible for the result. This continuity avoids the grey areas that are common when fabrication and installation are handled by different parties, and it makes final on-site adjustments easier.

Yes. We adapt the installation to the access, scheduling and usage constraints of each environment.

Need a clean, well-controlled installation?

We frame the install, the adjustments and the coordination to deliver a crisp, durable result.

What our clients say

Rated 5 out of 5 — 11 Google reviews
  • « Excellent contracteur. Ils ont fait mes planchers et autres projets et nous sommes très satisfaites. Je recommande 100%. »
    Mélina Desbiens
  • « L'expérience client au cœur des services de Dilamco Construction ! »
    Jean-Philippe Hébert