How much does a kitchen renovation cost in Quebec in 2026

Two of our real quotes, line by line, what moves the bill, the timelines and the mistakes that cost the most.

By Sean Diffley, owner and RBQ licence respondent7 min read

Renovated white kitchen with a quartz island
In this article

What does a kitchen renovation cost in 2026?

In Greater Montreal, a full kitchen renovation costs $25,000 to $50,000 before tax in 2026 when the layout stays the same. A refresh that keeps the cabinet boxes starts at $20,000. A kitchen opened to the living room, with a load-bearing wall removed, goes over $50,000.

These amounts come from our 2025 and 2026 quotes in Montreal, Laval and the North Shore. They include labour, cabinets, countertop and trades. Appliances are never included, and taxes are added at the end.

Type of projectIndicative priceWork included
Refreshfrom $20,000Cabinet boxes kept. Doors or fronts, countertop, backsplash, sink, faucet and paint.
Full kitchen$25,000 to $50,000Demolition, new cabinets, countertop, plumbing and circuits redone, kitchen flooring.
Kitchen and open planover $50,000All of the above, plus the beam, the engineer, the permit and the extended flooring.
Ranges from our kitchen projects. The firm price is set after a visit.

Two real quotes, line by line

Here are two full-kitchen quotes we issued, without names or addresses. In both cases: custom cabinets, quartz countertop, no structural work. Kitchen B costs $19,975 more, and flooring alone explains 39% of the gap.

Line itemKitchen AKitchen B
Custom cabinets, supplied and installed$14,800$19,500
Quartz countertop$3,200$7,475
Ceramic or porcelain backsplash$1,800$3,500
Flooring$800 (patching)$8,600 (new hardwood)
Electrical, light fixtures included$2,200$2,900
Plumbing, sink and faucet included$2,400$2,600
Drywall, paint and baseboards$900$4,650
Demolition and disposal$1,500within line items
Design and project management$1,250within line items
Appliance hook-ups$400within line items
Total before tax$29,250$49,225
Total with GST and QST$33,630$56,596
Amounts before tax, appliances excluded. Kitchen A: October 2025, North Shore. Kitchen B: March 2026, North Shore.

Three lessons stand out. Cabinets take 40% to 51% of the total, whatever the budget. Flooring is the line that varies most: simple patching around the new cabinets, or new hardwood across the whole room. And the countertop easily doubles with its length and number of cut-outs.

On our two other recent quotes, a full kitchen in Montreal came to $25,835, and a Laval kitchen with 408 sq ft of hardwood, countertop excluded, to $41,300, again before tax.

What drives up the cost of a kitchen?

For the same floor area, the gap between two kitchens comes from decisions made on the plan, not from the size of the room. Here are the items that weigh the most, from heaviest to lightest.

DecisionEffect on priceWhy
Removing a load-bearing wallVery highEngineer, beam, supports down to the foundation, permit and floor tie-ins.
Moving the sink to an islandHighThe drain, water and vent follow; we open the floor or the basement ceiling.
Full-height cabinets and drawersHighThe number of units, drawers and accessories weighs more than the finish.
Range hood vented outdoorsMediumDuct through the wall or roof, insulation and siding repair.
New electrical circuitsMediumIsland with outlets, induction cooktop, wall oven; sometimes a new panel.
CountertopVariableThe material, thickness, number of cutouts and seams set the price.

Keep the sink where it is

This is the first possible saving. A sink moved to an island brings the drain, the water supply and the vent with it. If the basement is finished, we also open its ceiling, then close it and repaint it.

Removing a load-bearing wall

Removing a wall that supports the floor above is a project within the project. An engineer sizes the beam and its supports, the drawing goes with the permit application, and the flooring must be tied in between the two rooms. This is the item that moves a kitchen into the third range.

Venting the range hood outdoors

A hood that vents outdoors removes grease, odours and moisture from cooking. It needs a duct through an exterior wall or the roof. A recirculating hood costs less to install, but it filters the air without replacing it.

What should a kitchen quote include?

A comparable quote names each item and its price. If one of the items below is missing, it will be billed later or it is not planned: ask for it in writing before you sign.

  • Demolition, protection of adjoining rooms and debris removal
  • Plumbing: drains, supply lines, dishwasher and fridge hookups
  • Electrical: dedicated circuits, counter outlets, under-cabinet lighting
  • Range hood and its duct to the outside
  • Cabinets, hardware, countertop, backsplash and installation
  • Flooring, drywall, paint and mouldings
  • Permits and plans, if the work requires them
  • Written schedule and payment schedule

Also ask whether the price is before or after tax; ours always are before tax. In Quebec, the GST (5%) and the QST (9.975%) are added: on a $40,000 kitchen before tax, they come to $5,990.

How long does a kitchen renovation take?

A custom kitchen renovation takes about three to five months between the first visit and the last touch-up. The work on site lasts only a few weeks; the rest of the time, the cabinets are in production.

StepDurationWhat happens
Visit and quote1 to 2 weeksMeasurements, check of the panel and the basement, written price
Design2 to 4 weeksPlans, choice of finishes, adjustments
Cabinet production9 to 15 weeksProduction from the signed plans
Work on site7 to 10 working days and upDemolition, plumbing, electrical, installation, countertop, finishing

For kitchen A, we planned 7 to 10 working days on site. New flooring, opened walls or a countertop installed after the cabinets lengthen that time. We time the demolition to the cabinet delivery date, so you live without a sink for as short a time as possible.

Do you need a permit to renovate a kitchen?

No, not to replace cabinets, a countertop or a sink in the same spot. The City of Montreal classes this work as cosmetic renovation that needs no permit. A permit becomes necessary as soon as the work touches the structure or changes the size or layout of the rooms, for example by removing a wall.

The City does not issue permits for interior plumbing and electrical, but this work is still regulated: electrical work is done by a contractor licensed by the CMEQ, plumbing by a contractor licensed by the CMMTQ. Planning rules vary from one city and borough to the next: our service area pages sum up the rules of each municipality.

The mistakes that cost the most

  1. Comparing totals instead of line items. The lowest quote is often the one that leaves out the range hood, the electrical or the permit.
  2. Changing the plan after the order. A cabinet changed during production goes back to the start of the lead time.
  3. Choosing the appliances last. Their dimensions and circuits set the cabinets; hand over their spec sheets before the plans.
  4. Demolishing without checking the electrical panel. A full panel discovered mid-project delays everything.
  5. Paying cash without a contract. Without a written contract that shows the licence number, you lose recourse to the contractor's bond.

How do you get a firm price for your kitchen?

A firm price for your kitchen requires a visit, because a per-square-foot price found online does not describe your kitchen. We measure, look under the sink, open the electrical panel and go down to the basement under the kitchen. You then receive a line-by-line quote, with the schedule. Before comparing, check the RBQ licence of each contractor.

Sources

Questions about kitchen prices

Yes, if the cabinet boxes are sound and the layout suits you. We then replace the doors, the countertop and the hardware. It is the most direct way to stay close to $20,000.

No. You choose and buy them; we hook them up. Give us their spec sheets before the plans, because the dimensions and circuits depend on them.

Often because they do not cover the same thing. Compare line by line: permits, electrical, range hood, flooring and debris removal are the items most often left out.

Yes, because custom cabinets are ordered before demolition. With us, it is 40% at order, then the balance in two payments tied to cabinet delivery and completion, written in the contract.

It mainly helps to sell, because it is one of the rooms buyers look at first. The exact gain depends on the neighbourhood and the condition of the rest of the house: ask a local broker before investing to resell.

Get your kitchen priced

We measure in your home and give you a line-by-line price, at no charge.

5.0

What our clients say

5.0 out of 5 · 11 Google reviews

See the reviews on Google
  • « Excellent contracteur. Ils ont fait mes planchers et autres projets et nous sommes très satisfaites. Je recommande 100%. »
    Mélina Desbiens
  • « L'expérience client au cœur des services de Dilamco Construction ! »
    Jean-Philippe Hébert