Tearing out the old floor
- We remove the flooring, the baseboards and the thresholds
- We look for water stains and soft panels
- We measure the moisture in the concrete or the wood
We check the subfloor and the moisture before we lay your new flooring.

Floors redone across the West Island
We measure the areas and the height differences between rooms.
We protect the house and take out the old flooring.
We repair the subfloor before the new flooring is ordered.
We pour the levelling compound and let it dry properly.
We lay the floor, the thresholds and the baseboards, then trim the doors.
The order of the trades changes the invoice as much as the flooring you pick.

We measure the levels, open a corner of the subfloor, then price the work.
« Excellent contracteur. Ils ont fait mes planchers et autres projets et nous sommes très satisfaites. Je recommande 100%. »
« L'expérience client au cœur des services de Dilamco Construction ! »